Visit
Official Website

Latest News

MTC Defense Launches an In-Flight Demonstration in collaboration with Singapore's Equatorial Space Systems

Dec 23, 2020
MTC Defense Launches an In-Flight Demonstration in collaboration with Singapore's Equatorial Space Systems
View Full Size
MTC Defense has once again initiated its Aerospace efforts, this time in collaboration with Equatorial Space Systems from Singapore and in conjunction with HEMREL, MTC and UiTM's academic venture. The research lab contributed to the Low Altitude Demonstrator launch with space and technical assistance alongside logistical support.

The launch was the very first in-flight demonstration of the Equatorial Space Systems' HRF-1, a hybrid rocket motor which offers a more superior performance than traditional fuels, providing a more accessible and affordable future in rocket design. The 2.5m long LAD reached its target altitude of 1.2km.

MTCEC as C&S Engineering Consultant for Pusat Pendaftaran Rekod Negara

Oct 30, 2020
MTCEC as C&S Engineering Consultant for Pusat Pendaftaran Rekod Negara
View Full Size
On Wednesday, the contractor has been appointed for Pusat Pendaftaran Rekod Negara, Malaysia (the 1st ever of such building in Malaysia and South East Asia). MTC Engineering Consultancy Sdn Bhd (MTCEC) has been given the opportunity to be part of the team as C&S Engineering Consultant with our own engineers who have the capabilities as C&S Engineer cum BIM Modeller, appointed since May 2019. We hope this project will be the most successful Jabatan Kerja Raya project implementation in Building Information Modelling (BIM) + Industrial Building System (IBS) + Malaysian Carbon Reduction and Environmental Sustainability Tool (MyCREST) + Seismic Design.

Rocket Testing at Seberang Perak

Sep 22, 2020
Rocket Testing at Seberang Perak
View Full Size
Earlier today MTC Defense had initiated Rocket Testing at Seberang Perak. There were multiple objectives for the Rocket Testing - to test the STEM rockets for high school students, to test the specifically-designed Smokey Rocket and to test the multiple launching rockets with sounding telemetry system.

A
mong those that were present were multiple media outlets covering the news as well as the PDRM bomb disposal unit to ensure the safety of the testing.

MTC and UiTM Officiate their Academic Collaboration for Research Lab (HEMREL)

Aug 26, 2020
MTC and UiTM Officiate their Academic Collaboration for Research Lab (HEMREL)
View Full Size
MTC and Business Innovation & Technology Commercialization Center (BITCOM) UiTM has officiated their collaboration with a Memorandum of Agreement (MoA) and a Memorandum of Understanding (MoU). The MoA aims to build rocket technology propulsion byway of the academic collaboration. The said MoA is also introducing the High Energy Material Research Lab (HEMREL) located in UiTM, which has since been executing various research, experimentation and development activities.

MTC dan UiTM bekerjasama dengan pertukaran Perjanjian Memorandum (MoA) dan Memorandum Persefahaman (MoU). MoA tersebut bertujuan untuk pembangunan teknologi roket propulsi secara kerjasama bersama UiTM. MoA ni juga telah mewujudkan High Energy Material Research Lab (HEMREL) bagi tujuan pembangunan tersebut yang sehingga kini telah melaksanakan banyak aktiviti pembangunan dan ujian.

MTC Certified by MyHIJAU as a Sustainable Energy Provider

Mar 13, 2020
MTC Certified by MyHIJAU as a Sustainable Energy Provider
View Full Size
Last Wednesday, MTC OREC has been successfully granted the MyHIJAU Mark, a government-endorsed recognition certification that proves MTC's high standards in green technology and services. Specifically, this mark was intended to verify MTC's capabilities in total design solutions (EPCIC) of bio-methane plant, as ongoing biogas-from-POME production project is happening in Sedenak. MTC currently supplies the biggest bio-methane product to be injected in the national gas pipeline grid.

MTC is heavily pursuing to contribute in Malaysia's goals in reaching 20% of energy use to be sustainable by the year 2025. As a player in the energy industry, we are aware of the environmental impacts of the nature of our services and are determined to direct our focus in finding sustainable solutions in energy provision, whether it may be in directly producing renewable energy or minimizing our carbon footprint.

10 Years of Engineering the Nation (2009-2019)

Feb 18, 2020
10 Years of Engineering the Nation (2009-2019)
View Full Size

As we celebrate 10 years of developing home-grown, innovative engineering solutions, from fit-for-purpose relocatable platforms to producing sustainable bio-methane derived from palm oil effluent, we recollect MTC’s most memorable achievements from our decade of engineering the nation.
 

 

Our History

2009
MTC Engineering was incorporated. The company of 4 engineers began to provide services for engineering consultancy, naval architecture and marine solutions from its small office at Plaza Masalam, Seksyen 9 Shah Alam.


2010

Expanded MTC’s portfolio to provide engineering consultancy on all marine disciplines as well as a dedicated Project Management Team.

With a concerted initiative to build engineering talent from the ground up, MTC pursued support from the National Oceanographic Directorate to throw engineering competitions in schools. Proudly, MTC established the Underwater Remotely Operated Vehicles (UROVEC) Competition in secondary schools around Kuala Lumpur and Selangor for 5 consecutive years. MTC has also sponsored and supported rugby teams from various schools in goals to further promote their brand to younger generations.

2011
MTC’s flair quickly became noticed by PETRONAS Carigali for its pilot project and was awarded the turnkey EPCIC for its upcoming leasing of the company’s first FPSO - FPSO Nautica Muar. This had opened up new services for the company - floater chartering and wellhead solutions. With such early recognition of MTC’s capabilities, its presence was instantly discerned as the local up-and-comer in the O&G industry.

2012
FPSO Nautica Muar successfully deployed to and reached first oil at Kayu Manis South East field.

To compliment its turnkey EPCIC services for a total asset solutions, MTC also established its own in-house Operation & Maintenance team - the precursor for MTC to show its aptitude as a comprehensive solutions provider, from EPCIC, to floater chartering, to O&M and also T&I.

Due to the growing numbers of staff, MTC had to relocate from its Plaza Masalam office to Laman Seri, Seksyen 13 Shah Alam.
Nautica Muar ready for sailaway

2013
After a quick 6 months at KMSE field, Nautica Muar redeployed to Anjung Kecil field. At Anjung Kecil, MTC operations were proven to be incredibly cost-effective and straightforward in its performance, as it achieved the lowest unit production cost of the whole of Carigali Malaysia Operations at the time being, amounting to less than USD10 bopd at a production rate of USD12,ooo bopd. Fast-forward to 2019, MTC beat its own UPC again at Jitang field for its FPSO operation.

To further take business-friendly and profit-maximizing steps, MTC expands its catalog to also provide complete solutions for Early Production Systems.

2014
MTC’s first Intellectual Property, the trademark ‘Humming Bird Offshore Solutions’ was patented. This IP is a fit-for-purpose, relocatable platform that is able to deploy to 3 fields in the span of 5 years. MTC is the first operator that relocates the same FPSO at 3 different fields twice.

Since this year, MTC continuously hires interns and fresh graduates to ensure that its commitment to develop local talent is actualized. They are encouraged to participate and contribute in an engaging and collaborative habitat within company grounds. To this day, some of the fresh graduates still remain with the company throughout their professional careers.

2015
To diversify its services and distinguish organization, MTC Floating Solutions was incorporated to suit all engineering consultancy services whilst MTC Engineering became dedicated to floater solutions.

In line with its close relationship with academia, MTC worked together with Universiti Malaysia Terengganu for a Wave Generator concept that can produce sustainable energy for the grid. This move was MTC’s first endeavor into renewable energy and an exploration of its engineering range.

As the company grew in projects it also grew in size - MTC employed up to 100 permanent staff of majority engineers of well-rounded and extensive engineering acumen. This led its second move to the current MTC headquarters: MTC Campus at Seksyen U8 Shah Alam.

2016
MTC Group received its first ISO, which was awarded to MTC Floating Solutions.

The Civil & Structural department has been awarded for the design, building and completion of an ice factory in Tok Bali, Kelantan that will supply local fishermen with vital resources for the improvement of their local industry.

2017
The company’s second FPSO launched - MTC Ledang, which executed the fastest recorded FPSO conversion to first oil of an unprecedented 6 months. MTC Ledang’s course directed towards Ophir field, however, the field was short lived. The floater then became novated to Vestigo Petroleum for an Extended Well Test at Kayu Manis field once again to which it found prolific results. A new complete production system will be developed specifically for KMSE. From this point forward, the company has a clear focus to embark on mature, marginal and late life field development.

Shortly thereafter, MTC in collaboration with Transwater wins PETRONAS first Technology Challenge on Monetisation of Associated Gas from Offshore Flares by providing inventive solutions for Floating Compressed Natural Gas (FCNG) systems. The competition required  economic and resourceful solutions to utilize hydrocarbon resource and reduce carbon intensity in its process.

2018
MTC Ledang remains to produce oil at Kayu Manis South East field.

To further explore other field opportunities, MTC takes an ambitious move to bid for PETRONAS’ deep-water oil development Limbayong, off the coast of Sabah, in partnership with India’s giant Shapoorji Pallonji. Currently, three contenders still remain in the race.
 
2019
Incorporated MTC OREC, which was intended to delve into its first biogas project at Sedenak with a 15-year Gas Sales Agreement with Gas Malaysia. This is MTC’s first secured venture towards renewable energy services.

Incorporated MTC Defence to pursue services for the Royal Navy and MINDEF. It has since proposed unique solutions for Fast Interceptor Crafts and rocket motors. Being in tandem with academia, MTC also co-owned a High Energy Material Research Lab with UiTM - MTC HEMREL. This is intended for the development for rocket propulsion in Malaysia.

Contracted by Petron, MTC is installing a Calm Buoy system and fabricating a PLEM at 30m water-depth at near-shore Port Dickson. This marks MTC’s first ever sub-sea project.

MTC Floating Solutions was renamed MTC Engineering Consultancy to suit the more varied engineering disciplines that the company offers. Recently, the company has won Jabatan Kerja Raya’s (JKR) first BIM project through conventional tender for consultants of the Pusat Rekod Pendaftaran Negara. The project also involves seismic design, MyCREST and Industrialized Building System (IBS), proving MTC’s affinity for pursuing the latest technology within the industry.

With another successful RLEC work at MMHE of 4 months, MTC Ledang has successfully been redeployed and achieved first oil in Jitang field, Terengganu. Keeping in line with MTC’s involvement with academia, it is collaborating closely with Universiti Teknologi Petronas for a working lab on top of MTC Ledang to test out the university’s Free Piston Linear Generator (FPLG) prototype. The generator is intended to take in associated gas that is usually flared to power the generator, in pursuit of minimizing environmental damage that comes with flaring and sustainably reusing the energy to provide power.

2020
To the next decade of Malaysian engineering.

 
 
 
 
 


Exemplary Award to MTC Engineering for RLEC and T&I Work at MMHE from Vestigo Petroleum

Feb 18, 2020
Exemplary Award to MTC Engineering for RLEC and T&I Work at MMHE from Vestigo Petroleum
View Full Size
Last Thursday, Vestigo Petroleum celebrated their achievements in 2019 with their vendors and contractors at KLCC Convention Center. MTC Engineering was acknowledged for its exemplary performance for MTC Ledang refurbishment at MMHE and Transportation and Installation services at Jitang Field. Attending the Hi Tea on behalf of MTCE were Ahmed Baqthiar (COO), Aspuri (PM Project) and Haji Rasidi (CM). MTC Engineering achieved no LTI for both the RLE and Refurbishment at MMHE and T&I at the field. Presenting the award was Vestigo CEO Keith Collins.

 

 

 

MIDES Audits MTC Campus

Feb 12, 2020
MIDES Audits MTC Campus
View Full Size
Recently engineering officers of TLDM of the Malaysian Defense Industry Council underwent an auditing activity at the MTC Campus. This is a MIDES membership registration process for companies involved in the defense industry. This audit is based on the Bintang Score rating from MIDES with collaboration of SME Corp.

 

MTCFS C&S Engineer Ir. Dr. Salmaliza Salleh Speaks on BIM at Wisma IEM

Jan 9, 2020
MTCFS C&S Engineer Ir. Dr. Salmaliza Salleh Speaks on BIM at Wisma IEM
View Full Size
8th January 2020, Farah Hana Yusri.

The Institution of Engineers Malaysia (IEM) invited Ir. Dr. Salmaliza Salleh, Civil and Structural Engineer from MTC Floating Solutions, to share her expertise in a technical talk titled “Building Information Modelling (BIM) : Are You Keeping Up With The Trend?” which was held in the Auditorium Tan Sri Prof. Chin Fung Kee, Wisma IEM, Petaling Jaya, Selangor on 6th January 2020.

Since 2015, MTC Floating Solutions has successfully handled various Civil and Structural Engineering Consultation projects that involves BIM. Her name is known by the industry after MTC Floating Solutions Sdn Bhd became the first Civil and Structural Consulting Company in Malaysia which was appointed by Jabatan Kerja Raya (JKR) to handle JKR’s first BIM implementation using the Conventional Consultant Appointment Method up to LOD 300.




FPSO MTC Ledang Sailed and Safely Arrived At Jitang Field

Jan 7, 2020
FPSO MTC Ledang Sailed and Safely Arrived At Jitang Field
View Full Size
30th December 2019, Farhan Fauzi.

MTC had achieved a major contract milestone on FPSO MTC Ledang refurbishment, sail-away and safe arrival at Jitang Field, a field part of Vestigo Petroleum’s Irong cluster in Terengganu. This is the second time MTC has demonstrated its transportation and installation experience performing the task during the difficult monsoon conditions, a timely accomplishment. With the campaign slogan ‘Safely Riding the Monsoon II’, MTC’s in-house T&I team got the tow assisted by Bridge Water 130 and escorted by MP Prospect vessels.

The last of its T&I campaign activities at Jitang field has been successfully completed on 27th December. Its OCV Pride has demobbed from offshore and proceeded to Kemaman for demobilization activities. The FPSO has now proceeded for its start-up operations.

The MTC Ledang sail-away ceremony was conducted on 19th November and towed out of the quay a week later, on 26th November, after getting all necessary clearances. The ceremony was attended by the Ledang project team, field operator Vestigo Petroleum, O&M provider EPOMS as well as the Malaysian Development Bank. The FPSO took 4 months of RLEC work at MMHE (Malaysia Marine Heavy Engineering) shipyard in Johor which included the installation of additional modules onboard: a new BWS (bulk water separation), submersible pumps, power supply for WHP and FPLG (flow process linear generator).

Currently, MTC is one of the three contenders for Petronas Carigali’s Limbayong oil and gas field development in Sabah. 

News Archives and Hyperlinks related to MTC

Nov 28, 2019
News Archives and  Hyperlinks related to MTC
View Full Size

MTC Awarded By Petron On PLEM Fabrication And Installation Contract

Nov 27, 2019
MTC Awarded By Petron On PLEM Fabrication And Installation Contract
View Full Size
22th November 2019, Lukman Hakim.

MTC Engineering Sdn Bhd (MTCE) has been awarded with the Marine Import Facilities 2 (MIF2) Package 4, PLEM Fabrication and Subsea Marine Equipment Installation for Petron Malaysia Refining & Marketing Berhad on the 7th of November 2019. The project is for PLEM Fabrication, Installation of PLEM & SPM Buoy and Subsea Marine Equipment including Subsea Hose, Umbilical, and Tie-in to the existing 20” and 10” (ex Cabot) in Port Dickson Refinery which is located about 90km from Kuala Lumpur in Port Dickson, Negeri Sembilan. The new marine facilities are for Petron’s new clean product, MOGAS.
 
The project completed one of its milestones with arrival of the Single Point Mooring (SPM) Buoy in Malaysian waters on the 15th of November 2019. The SPM Bouy was transported from China by BBC Austria, a Heavy Lift Vessel and currently is now located at a temporary storage area. The project Kick Off Meeting was held on 18th November 2019. Installation campaign is scheduled in early Quarter year 2020. As part of MTCE long time commitment in promoting Malaysian capabilities and maximizing local entities involvement in oil and gas industry, the Pipeline End Manifold (PLEM) will be fabricated by a local fabricator in Port Klang. The fabrication is planned to commence in Quarter 4 of year 2019.

Free-Piston Linear Generator: Research Collaboration With Universiti Teknologi Petronas (UTP)

Nov 22, 2019
Free-Piston Linear Generator: Research Collaboration With Universiti Teknologi Petronas (UTP)
View Full Size
22nd November 2019, Fadli Omar.
 
MTC Engineering Sdn Bhd (MTCE), a Malaysia company specialising in FPSO leasing, field production operation, and turnkey development for mature and marginal fields, is a strong advocate for utilisation of locally developed new technologies. Since 2013, MTCE has been utilising locally developed technologies onboard of its fleets of floaters.

Staying true to this commitment, MTCE together with its technology partner Universiti Teknologi Petronas (UTP) is moving on to a new milestone in development of the Free-Piston Linear Generator (FPLG) for offshore application. The FPLG prototype shall be tested onboard of the FPSO MTC Ledang utilising hydrocarbon gas from Jitang field located offshore Terengganu as its feed gas in Q2 of year 2020.

Main features of the FPLG is as follows:
  • Production of electric power by harvesting high pressure hydrocarbon gas which otherwise would be flared thus promoting reduction in greenhouse gas emission which is in-line with Paris Agreement 2016. Furthermore, the electrical energy generated will be contributed back to the grid hence reducing overall operating cost (waste to wealth)
  • Free motion piston (Free-Piston) which creates flexibility that allows it to work with wide range of pressure and gas composition (flexi-fuel) such as high-CO2 natural gas
  • The reciprocating motion caused by gas expansion / combustion cuts the magnetic flux thus generating electrical energy
  • Consist of only one moving part resulting to high mechanical efficiency and power to weight ratio
  • Modular concept allows scalable power generation output
The FPLG is envisaged to be a compact power generation unit suitable for offshore application with special attention given to application on unmanned facilities. 

MTC Experience Sharing at FFA 2019 Shanghai

Nov 10, 2019
MTC Experience Sharing at FFA 2019 Shanghai
View Full Size
30th October 2019, Fadhli Omar
 
MTC Group (MTC), a homegrown company specialising in FPSO leasing, field production operation, and turnkey development for mature and marginal fields, presented a paper on its experiences in the industry at the “6th FPSO, FLNG & FSRU GLOBAL SUMMIT 2019”. The event which was held in Shanghai was attended by major industry drivers from both local Chinese and international players. MTC was represented by Mohd Roslan Daut, General Manager (Development).

Under the topic of “Delivering Economical Multi-deployment FPSO Conversion Project On-Time and Within Budget”, the delegates were enticed with MTC’s time tested formula of success in making marginal fields development economical. The delegates too were asked not to just look at the potential of an individual marginal fields within one’s own awarded block but are persuaded to explore the idea of trans border development strategy. Where block owners are asked to developed marginal fields within their awarded block as a collective with other block owners using the multi deployment FPSO strategy. This is the strategy that MTC has been promoting and is employing for the development of marginal fields in Malaysia.

The conference in general highlighted the potential of China as a one stop centre for EPCIC of the FPSO, FLNG and FSRU market. Major Chinese local players such as BOMESC, Hudong-ZhongHua Shipbuilding Group too were featured during the event.

MTC Signs Biogas Renewable Energy Development Deal

Oct 20, 2019
MTC Signs Biogas Renewable Energy Development Deal
View Full Size
10th October 2019, Roslan.
 
MTC has embarked into being a biogas producer and turnkey EPCI after the announcement of Gas Purchase Agreement by Gas Malaysia Berhad. On Oct 8, Gas Malaysia’s wholly owned subsidiary — Gas Malaysia Virtual Pipeline Sdn Bhd (GMVP) signed a gas purchase agreement with Kulim Green Energy Ventures Sdn Bhd  (KGEV)— a joint-venture company between Kulim (M) Bhd (a wholly owned subsidiary of Johor Corp), O’Rec Ind Sdn Bhd and MTC Engineering Sdn Bhd.
The deal will commemorate MTC together with joint venture partners under KGEV to develop the biggest plant for biomethane direct injection to the national grid Gas Malaysia’s Natural Gas distribution System (NGDS).
“This is synergized with MTC progressive plan to utilize its strengths moving another step towards being energy producer from small fields, offshore late life assets, orphaned fields and waste-to-energy potentials” stated Ir. Dr. Norshah, the MTC and KGEV director.

Hand Injuries HSE Campaign

Oct 20, 2019
Hand Injuries HSE Campaign
View Full Size
2nd October 2019, Zahir Kassim.
 
The campaign was held by MTC  at the MMHE Shipyard about 90 days before MTC Ledang redeployment in mid-November to its next destination, Jitang field. This campaign is one of many efforts to ensuring MTC meets its quality policies and ISO standards both within the yard lines as well as in the headquarters. Attending the event were special guests from MPM (Mr Adzwan and Tuan HJ Azmi) and VPSB (PM Rashid, PE Munira, HSE Officer Khairunnisa, FM Hj Mazli), whom also presented short speeches for commencing.

FPSO MTC LEDANG: BULK WATER SEPARATION MODULE INSTALLATION

Sep 30, 2019
FPSO MTC LEDANG: BULK WATER SEPARATION MODULE INSTALLATION
View Full Size
FPSO MTC LEDANG: BULK WATER SEPARATION MODULE INSTALLATION
 
30th September 2019, Fadhli Omar.
 
MTC Engineering Sdn Bhd (MTCE) announced the arrival of Bulk Water Separation (BWS) module to MMHE Shipyard for installation onboard of the FPSO MTC Ledang on the 20th of September 2019. The BWS module is fabricated in Batam, Indonesia by Influit Production Solutions.

The new module is designed to complement the existing crude stabilisation system to handle produced water production of 14,008 BWPD. Currently, works on integrating the module to the existing system onboard of the FPSO is still ongoing.
 
The installation is part of conversion works on FPSO MTC Ledang for deployment to Jitang Field located approximately 154 km offshore Kemaman Supply Base (KSB), Terengganu. Jitang Field is a part of Irong Cluster PSC development operated by Vestigo Petroleum Sdn Bhd (VPSB). It was discovered by PETRONAS Carigali Sdn Bhd (PCSB) in April 2016 with the drilling of Jitang-1. First oil of the facility is expected to be in Q4 of 2019.